Client Name: TranslinkProject Details:
Design and Build new storage facility for vehicle parts. Constructed on piled foundations, ground beams, RC floors with steel portal frame. Wall & roof cladding with fall arrest system. Facing block throughout with internal racking installed to clients specification and needs.
Duration of contract: 16 weeks.
Location: Pennyburn Engineering Workshop, Derry/Londonderry.
Architect: Design 2 Architects.